欢迎光临浙江建材有限公司

400-6817179
收藏  |    /  EN
您的位置:首页> 宝盈棋牌娱乐 > 桥梁 > 104国道工程

104国道工程

  • Bridge

    项目

  • 工期

  • 9.91kmkm

    施工面积

项目详情

    The reconstruction project of Pingyang Guo Zhuang to Chenxia à section of National Highway 104 is 9.91 kilometers long. It is of Class I highway standard and asphalt concrete pavement, with a design speed of 80 kilometers per hour, two-way four lanes, and a roadbed width of 24.5 meters, of which 4.5 meters of auxiliary lanes are added on both sides of the crossing section of Kunyang Town, and the roadbed width is 33.5 meters. The total project investment is 602 million.

宝盈棋牌娱乐

至臻精品

卓越品质

专业定制

厂家直销

联系电话:0571-28197870